Home.Company.Services.Health & Safety.Portfolio.Contact.Links.Find Us.
WELCOME
Registered in England 03059325

Company VAT No: 652864023

About your privacy at this website
useful links    I    sitemap    I    privacy policy    I    documentation    I    contact us    I    e-mail us    I    webdesign: www.samsoninternet.com
74 Church Road  •  Teddington  •  Middlesex  •  TW11 8EY  •  Tel: 020 8255 7500  •  Fax: 020 8255 7501
Past Projects
Documentation
Click here for access to our
documents and certificates.
Newsletter
Click here to subscribe
to our newsletter.
© Sexton Demolition Ltd 2008

SEXTON DEMOLITION LIMITED

 

Sexton Demolition Portfolio - Shipphams Factory
Shipphams Factory & Social Club site, East Walls, Chichester, West Sussex
Portfolio 2.
BACK TO PORTFOLIO
Client:
Timescale:

Brief Description of Works

The works comprised the careful demolition in four phases, down to top of lowest slab level, with follow-up breaking out and grubbing up of ground floor slabs, foundations and footings of the existing ‘Old Shippams Building’ and the ‘Shippams Social Club’ complete, excluding a section of the existing facade to the ‘Old Shippams Building’ along East Walls, (including a small return to East Street), which was retained.

All solid concrete slabs foundations and footings were carefully lifted and removed under the presence of archaeology watching brief.

The extent of the buildings to be demolished was split between two separate sites.  The larger of the two sites, the ‘Old Shippams Production Building’, was located to the East side of Chichester’s main Shopping Centre, adjacent to East Row, East Walls and East Street.

The second, smaller site, the ‘Shippams Social Club’, was located on the opposite side of East Walls road from the ‘Old Shippams Building’ adjacent to Grade I listed Roman East Wall.

HOVER TO ZOOM
HOVER TO ZOOM
Kier Property Developments Limited
Demolition: 20 weeks